Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 3 Next »

The Scheduler is a powerful report and task-scheduling tool used with both Eagle PACE and Eagle STAR components. You can use the Scheduler to:

  • Run events such as reports or tasks at specific or variable pre-programmed times.
  • Run events as dependency of another scheduled event, statistic or code value.
  • Administer time-dependent processes such as income accruals.
  • Set up a specific portfolio or group of portfolio reports to be automatically generated and delivered: daily, weekly, or monthly.
  • Distribute reports based upon user-defined distribution channels such as Portal, email, FTP, File Copy or Print.
  • Set the storage location and viewer for previously run reports.

The Scheduler contains ten windows for different Scheduler tasks, each with a corresponding access button across the top. Before setting up a schedule, you must create a Data Entry Profile. Once you have setup a Data Entry Profile, you create a calendar and define days and time zones. After you create the calendar, you design a schedule and link it back to the calendar. Schedules can be run against Process Centers, Conversion Status or an Entity List.

To view the content of the PDF, click the thumbnail below. The book opens in the PDF viewer. To search the document for specific terms or concepts, we recommend that you download the PDF.

  • No labels