Prevent Truncation of Duration Input Values
Performance System Parameter 29, Truncate Pivot Point Duration in Days to integer, allows you to remove a rounding inaccuracy in calculating the Fixed Income Attribution Pivot Point's yield change in Global Attribution analysis. Options include:
0, maintains the full float precision to remove an unnecessary source of reduced precision noise in the calculations of the yields used to calculate the yield change. Provides greater accuracy.
1, truncates the duration input value used to look up the yield from the yield curve to a full day integer value. This option provides backwards compatibility.
The default value is 0. Eagle recommends that you use the default value of 0 to remove the rounding inaccuracy.