Cost Basis Adjustment Options
In the Cost Basis Adjustment panel, you can execute a cost adjustment.
Options may vary according to your selections.
Entity Information
The following are the options for entity information:
- Entity ID (tag 1163). Specifies the unique identifier of the entity.
- Entity Name (tag 1164). Specifies the abbreviated name of the entity.
- Base Currency (tag 86). Displays the base currency of the entity.
- Accounting Basis (tag 21). Specifies the accounting basis.
Security Information
The following are the options for security information:
- End Date (tag 221). Specifies the end of period date.
- Event Type (tag 55). Specifies the type of event. Available options include Increases Basis and Decreases Basis.
- Long/Short Indicator (tag 15). Indicates whether the position is long or short. Available options include Long and Short.
- Issue Name (tag 961). Specifies the name of the security.
- Ticker (tag 13). Specifies the symbol used to uniquely identify a security.
- Xref Type (tag 1234). Displays the cross reference type associated with the security.
- Xref Security ID (tag 1233). Specifies the cross reference identifier associated with the security.
- Primary Asset ID (tag 14). Specifies the identification number of the primary asset ID type for the security.
- Instrument Type (tag 11). Displays the instrument type, such as cash, equity, or fixed income.
- Security Type (tag 82). Displays the security type of the asset.
- Issue Currency (tag 85). Displays the local currency of the security.
Accounting Information
The following are the options for accounting information:
- Choose Open Lot (tag 962). Displays a list of open lots for which you can process a cost adjustment.
- Event Type (tag 502). Displays the business intent of the transaction.
- Trade Date (tag 35). Specifies the effective date of the trade. The trade date cannot be greater than the post date, accounting date, or settlement date.
- Accounting Date (tag 36). Specifies the date the trade is reported. The accounting date must be greater than the trade date.
- Monthly Accounting Date (tag 4733). Displays the month end accounting date.
- Trade Quantity (tag 159). Displays the quantity of the open adjustment event.
- Unit Price (tag 160). Specifies the price of the security per unit.
- Original Cost Local (tag 162). Displays the total cost of the executed trade.
- Current Cost Local (tag 128). Displays the current identified cost basis in local currency.
- Current Cost Adjustment Local (tag 50). Specifies the amount of the adjustment.
- Local to Base FX Rate (tag 87). Displays the local to base foreign exchange rate.
- Current Cost Adjustment Base (tag 50). Displays the base amount of the trade.
- Target Event ID (tag 26). Displays the target event ID type.
- Custodian Bank Name (tag 1146). Specifies the name of the custodian bank.
- Custodian Bank Code (tag 1240). Specifies the custodian bank code.
- Custody Bank Account Number (tag 1660). Specifies the custodian bank account number.
- Custody Bank Subaccount (tag 11852). Specifies the custodian bank subaccount.
Other Information
The following are the options for other information:
- Original Trade Ticket Number (tag 761). Specifies the origin of the trade ticket number.
- Transaction Notes (tag 56). Specifies comments about the transaction.
- Reason (tag 1828). Indicates the reason for the cost adjustment.
- Offset Account (tag 1825). Specifies the offset account.
- Recalculate Yield (tag 1257). Determines whether to recalculate yield. Options include Yes and No.
View Cost Adjustment Activity in the Position Viewer Tool
Before the cost adjustment was made, the position had a current cost local value of $20.000.00.
With the "increase in basis" adjustment of $555.00, the cost is adjusted to $20.555.00. You can view the cost adjustment activity on the Open Adjustments tab of the Cost object within the Position Viewer tool.
0 Comments