Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You can override field level linking periods at report run time by specifying different link periods in the Performance Analysis report profile. In the Performance Analysis report profile, you can specify the report effective date using two options specific to Eagle Performance:

Link Period Override Option

...