Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

You can override field level linking periods at report run time by specifying different link periods in the Performance Analysis report profile. In the Performance Analysis report profile, you can specify the report effective date using two options specific to Eagle Performance:

Link Period Override Option

...

For attribution fields, you can use the Link Period Override option only to override linking periods entered through a fixed date date range to achieve "any date to any date" attribution. For more information, refer to the Attribution Guide.

Link Period Override Option Example

...

For more information about setting up Advanced Reports, refer to the Advanced Reporting User Guide.

If you fail to perform these steps, the system processes the report as if you did not select the Link Period Override. It uses the Performance Analysis profile dates rather than the dates you input in the Advanced Report profile.

...

For more information about setting up Advanced Reports, refer to the Advanced Reporting User Guide.

If you fail to perform these steps, the system processes the report as if you did not select the Link Period Override (Date Rule). It uses the Performance Analysis profile dates rather than the date you input in the Advanced Report profile.