Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

The Performance System Parameter option supports specific monthly build requirements. If Monthly Mode (1 = Enabled) is enabled, all changes approved during any day in the month are automatically pushed back to the first day of the current month. As a result, the Start Dates and Stop Dates for all membership changes are committed to ENTITY_RANGE_DETAILS as of the first of the month.

...

Anchor
_Toc14091719
_Toc14091719
Anchor
_Toc14685646
_Toc14685646
Pending Approvals (Monthly Mode)

You can set the Monthly Mode setting in the Pending Approvals Details screen. To illustrate, consider an example where a client executes daily builds for 1/1/1980 through 1/31/1980 for the composite shown in the following figure. The builds for the composite determined that JKEnt3a, JKEnt3b, JKEnt3c, and JKEnt3d met the composite criteria with an Effective Date of 1/4/1980. Additionally, JKEnt74 and JKEnt79 met the criteria with Effective Dates of 1/7/1980 and 1/31/1980, respectively. However, because Monthly Mode is enabled, the Start Dates have been converted to 1/1/1980.Performance Composite Pending Approval Details (Monthly Mode)Image Removed

...

Approve or Reject Individual or Multiple Records

...

  1. In the Performance Composite Pending Approval Details screen, check the check box next to the entity.

  2. Click Approve at the top of the screen.
    This commits the membership change into ENTITY_RANGE_DETAILS for the composite (JKACOM28) for the selected entity with the appropriate Start Date or End Date, which in this case is 3/25/2009.

  3. If the change is not valid, click Reject to ensure the record is not committed.

...